Letter of transmittal, final draft
S.U.N Team
Singapore
Institute of Technology
10 Dover
Drive
Singapore
138683
13th March
2018
Chew Men
Leong
Land
Transport Authority
1
Hampshire Road
Singapore
219428
Dear Mr.
Chew,
Re:
Proposal for Improvement of Electric Bus System in Singapore
Enclosed for your kind consideration is the
following proposal for the improvement of the electric bus system in Singapore.
This proposal has been prepared in response
to your letter of authorization calling for proposals. The proposal has been
developed in light of the problem that the Land Transport Authority (LTA) is
facing with electric vehicle while spearheading Singapore’s electric vehicle
uptake in public transportation. Our team’s intention is to offer a systematic
method that could more aptly address the problems associated with the present
electric bus system and infrastructure.
The report consists of a review of the
identified problems, the rationale behind our proposed solution, and a detailed
summary of all related primary and secondary research. As potential electric
bus users ourselves, we have provided information on the flaws of the current
electric bus system, piloted by Go-Ahead Singapore, a case study of the
potential solution and a detailed discussion on how the relevant agencies may improve
on them.
We would like to express our gratitude to you
for taking the time to read through the proposal. Your consideration of our
suggestions to transform the public electric bus system into a more efficient
and emission-free system is greatly appreciated.
Yours
sincerely,
Teo Shu
Min
S.U.N Team
Representative
Comments
Post a Comment